Low weight and effective construction version for tunnel construction, the TWINNY S, optimized for overhead welding, is ideal also for thin materials in civil engineering and tunnel construction, Exchangeable comb wedges are also available for welding with or without a test channel.
  • Easy Operation
  • Low Weight
  • High Welding Speed
  • Controlled temperature and drive
  • Even under harsh environmental conditions perfect welding results thanks to hot air system